A 10-year ban on an entire industry is a bad idea.

Companies choose low-risk places to invest. A city that bans an entire industry looks too risky. If this passes, El Dorado’s economic future stalls.

The 30-second version
1

It bans an entire industry for 10 years

Data centers and battery storage would be prohibited in El Dorado. Only another public vote can undo it.

2

Companies avoid risky cities

Businesses weigh risk before they invest. A community that bans an entire industry drops off the short list, and not just for data centers. Every kind of business notices.

3

Our problems don’t fix themselves

High property taxes. Bad roads. Declining population. Without economic development, none of it improves.

VOTE NO

Regulate it. Scrutinize it. Negotiate it. But don’t ban it.

Read the ballot question
Why it matters

The next company is watching

The next company considering El Dorado may have nothing to do with data centers. When businesses decide where to invest, they look at certainty. Responsiveness. Permitting. Community support.

Because when investment doesn’t come, our needs don’t disappear.

Why this matters for El Dorado
We don’t need a ban

El Dorado already has rules for this

In June 2026 the City adopted zoning rules for data centers and battery storage. Every project needs a Special Use Permit: a public hearing, full disclosure of water and power needs, and the City’s right to set conditions or say no.

How the City’s rules work
El Dorado Lake

Water is not a problem

El Dorado has one of the biggest water advantages in Kansas. Our lake holds over 50 billion gallons, and the City has 10 million gallons a day set aside for industry.

The headlines about data centers using millions of gallons a day describe evaporative cooling, where water is used up as it cools the building. Many new data centers use closed-loop systems instead. The loop is filled once during construction and the same water circulates for years. Microsoft says its new closed-loop sites use about as much water in a year as a single restaurant.

For comparison, our refinery already uses an estimated 4 million gallons or more a day.

We also still owe $39.8 million to the U.S. Army Corps of Engineers for our lake storage. That industrial water needs buyers.

Gallons per day
Closed-loop data center, after initial fill nearly 0
El Dorado refinery today (estimated) 4+ million
Industrial capacity set aside by the City 10 million
Lake yield in a 50-year drought 22 million
Property taxes

Growth can lower your tax bill

A large new project spreads the cost of local government across more value. If local governments hold their revenue flat, mill levies fall for everyone else. And Kansas’s data center law is a sales tax break, not a property tax break.

See the full example
Illustrative $1 billion data center (~50 MW facility)
$1,010
a year saved on a $250,000 home
That’s $404 for every $100,000 of home value, assuming $300 million is taxable real property — roughly a 50 MW facility. Hyperscale campuses run into the gigawatt range.

See what a 1 GW facility could mean →
What’s on the ballot

Four lines in the ordinance, four problems

10 years

Locked in for a decade

Once passed, the City Commission can’t adjust it for ten years. The only fix is another election. A decade is a long time to hang a “closed” sign on El Dorado while other towns compete for the same investment.

10 MW

The line is drawn very low

Florida’s incentive law defines a data center at 100 megawatts. This ban starts at one-tenth of that, so it reaches far beyond giant AI campuses to smaller server and computing facilities.

100,000

Gallons a day is a tiny slice

That’s 1% of the 10 million gallons a day the City has set aside for industry. The ban applies no matter how efficient the cooling design, and the City already requires water numbers before any approval.

80 kWh

It bans batteries, too

Battery storage above 80 kWh is prohibited, not just at data centers. That covers systems businesses and utilities use for backup power and grid reliability, which national fire codes and the City’s permit process already regulate.